The Thomas Deacon Academy


Queen’s Gardens, Peterborough, Cambridgeshire

Main Contractor:
Laing O’Rourke

Value: £1.2m

Architect: Foster & Partners

Scope of works: partitions, glazed screens, doors and frames

The performance requirements for this project included for the glazed screens to meet the Academy criteria of withstanding a crowd pressure point loading of 1.5kN, 30 minute fire rated double glazed screens, and meet an acoustic performance of 42db.

One of the largest state schools in Europe and most expensive state school in Britain, costing £46m, The Thomas Deacon Academy opened in September 2007.

Stortford Interiors worked closely with Laing O’Rourke and Foster & Partners to provide a performance solution to the design requirements of this prestigious project.

Stortford Interiors supplied and installed floor to slab Komfort Polar Double Glazed/PolarTec partitioning systems together with curved feature areas. The installation also included the supply of doors and over panels, as well as integrated fire rated glazed doors to the glazed screens.

Stortford Interiors recently won the 2008 Association of Interior Specialists Silver Award (Partioning - value band over £100K) for this project.

(Partioning - value band over £100K) for this project.(Partioning - value band over £100K) for this project.

 

Donovan Data Systems


Blue Fin Building, London SE1

Main Contractor:
Structure Tone UK

Value: £400K

Architect:11.04 Architects

Scope of works:Gustaf Real Wood demountable suspended ceiling systems and British Gypsum plasterboard bulkheads and monolithic ceilings

Donavon Data Systems moved their new data centre and European headquarters to the Blue Fin Building in October 2007. The building embraces the latest thinking on efficient working and reduced environmental impact. The project brief to the architects 11.04 was to create an intelligent modern office environment using recycled, natural and sustainable materials and technology, and a working environment that would be both comfortable and satisfying for staff and visitors.

The project gave Stortford Interiors the rare opportunity to install a Gustaf real wood ceiling within an extensive network of M/F margins and bulkheads.

StructureTone recently won the 2008 Association of Interior Specialists Gold Award (Interior Fit-Outs - value band over £1M) for this project.

for this project.for this project.

Hammerson Plc


Grosvenor Street, London W1

Main Contractor:
Wates Interiors

Value: £400K

Architect: Stiff & Trevillion

Scope of works: Metal and plasterboard ceilings, drywall partitions, and fibrous plaster ceilings

An extremely fast-track project comprising a wealth of architecturally complex details in an installation over four floors comprising offices, IT training suites, a Boardroom, Restaurant and Kitchen. What must be one of the most impressive Receptions in the West End contains a mass of fibrous plaster features adjacent to a three-storey atrium with additional troughs and lighting at soffit level.

Stortford Interiors won the
2007 Association of Interior Specialists Gold Award (Ceilings – Large contracts £100,000 and over) for this project.

PriceWaterhouseCoopers


Cornwall Court, Birmingham

Main Contractor: Wates Interiors

Value: £1.1m

Architect: BDG Workfutures

Scope of works: Mineral fibre ceilings, drywall partitions, glazed partitions, joinery

This fit-out was
BCO AWARD WINNING PROJECT: “BEST OF BEST” IN 2004. A 100,000 sq/ft remodelling and fit-out of PWC’s existing premises was undertaken to demanding timescales and the building was occupied throughout the entire process. Stortford Interiors undertook mineral fibre ceilings, drywall partitions, glazed partitions and joinery. Extremely close working with our Client’s team helped to ensure PWC’s new office space in Birmingham being named the most dynamic work environment in the UK.

GlaxoSmithKline (GSK)


FLEXILABS

The need for GSK to respond to the new and changing R&D environment led to the development of the FlexiLab concept - a completely flexible laboratory design solution.

Scientists were often impeded by laboratories with fixed furniture, fume cupboards and a rigid services infrastructure with little scope for change.

The novel but fully tested FlexiLab concept allows the laboratory workspace to constantly evolve to respond to GSK's new and changing R&D environment. The need is for a scientific work space that can be rapidly installed and be reconfigured simply when required. The FlexiLab concept provides this with minimal disruption.

FlexiLab principles are endorsed by GSK and being implemented on a global basis. FlexiLabs are being successfully applied throughout all GSK European Operations R&D facilities.

The timescales for installing these projects are extremely tight and involve working in conjunction with a number of other contractors on site. Due to Stortford Interiors' successful high spec, high quality and well-managed installation, work is on going with GSK on this particular project across their numerous laboratories.

Stortford Interiors has been the major contractor for the installation of the ceilings and walls of the FlexiLab system at several GSK sites, including their largest one-off laboratory project - the Triple FlexiLab at their site in Stevenage. The FlexiLab concept uses high spec products based around Komfort Polar silicone glazed full glass partitions, including glass doors and Burgess metal pan ceilings.

Walls & Flooring

Floor to ceiling glass wall partitions divide the laboratory and write-up areas.

Wall Features:
• 12mm toughened glass
• Frameless construction
• Quick installation and reconfigurable

Floor Features:
• Carpeted write-up
• Welded vinyl floor in laboratory

Modular Ceiling

Fully accessible plank and beam ventilated ceiling

Features:
• GSK modified ceiling grid with additional structural support
• Service pods can be supported from ceiling beams in any position
• Pressurised supply air ceilings voids
• 2700mm optimal ceiling height
• 1200mm width clear access into ceiling void
• Supports light fittings
• Facilitates services installation and maintenance

Specification:
• Polyester painted 1200x300mm lay-on tiles
• 100mm linear beam grid
• 10mm drop rods at 900mm centres
• Maximum 150mm to first drop rod from beam joint to achieve structural integrity

 

GlaxoSmithKline Hertfordshire


Stortford Interiors has an established relationship with GSK, and is recognised as a preferred contractor. As such, project work is on going across several of the GSK sites in Hertfordshire. Some of the more recent projects are detailed below.

Stortford Interiors has also installed specialist plasterboard ceilings and Komfort double glazed partitions to the management suites at GSK's offices in Stevenage.
GSK Harlow and Welwyn

Project work at GSK in Harlow and Welwyn has involved the installation of partitions, ceilings and various types of flooring, together with smaller scale refurbishment work.
GSK Addenbrookes Hospital Cambridge
We have been involved in carrying out various partition, ceiling and decoration works in a working hospital environment.

Osborne Clarke, London

One London Wall, London EC2


Main Contractor: Wates Interiors

Value: £350K

Architect: The Harmsen Group

Scope of works: Metal and plasterboard ceilings, drywall partitions, glazed partitions, joinery

Another
award winning project demanding a plethora of distinctive architectural detail from Stortford’s. Angled sloping dry-walls around the central core of the building and reception area form meeting rooms complemented by glazed partitioning. M/F and metal ceiling expanses are broken up by curves, bulkheads and upstands to add visual interest and to signify different areas for different office functions and activities. Further flexibility is facilitated by curved glazing and curved solid walls. Joinery and Doorsets completed Stortford Interiors' scope of works.

demanding a plethora of distinctive architectural detail from Stortford’s. Angled sloping dry-walls around the central core of the building and reception area form meeting rooms complemented by glazed partitioning. M/F and metal ceiling expanses are broken up by curves, bulkheads and upstands to add visual interest and to signify different areas for different office functions and activities. Further flexibility is facilitated by curved glazing and curved solid walls. Joinery and Doorsets completed Stortford Interiors' scope of works. demanding a plethora of distinctive architectural detail from Stortford’s. Angled sloping dry-walls around the central core of the building and reception area form meeting rooms complemented by glazed partitioning. M/F and metal ceiling expanses are broken up by curves, bulkheads and upstands to add visual interest and to signify different areas for different office functions and activities. Further flexibility is facilitated by curved glazing and curved solid walls. Joinery and Doorsets completed Stortford Interiors' scope of works.

Hertz Cars

Uxbridge, Middlesex


Main Contractor: Wates Interiors

Value: £430K

Architect: Ridge

Scope of works: Mineral Fibre Suspended Ceilings / Dry-wall Partitions / Curved Feature Walls / Glazed Partitions / Glazed and Timber Door Sets

Stortford Interiors employed their considerable glass and dry-wall partition knowledge to satisfy the aesthetic and performance requirements of Hertz Cars new European Head Office. The works involved the installation of a series of acoustic rated glass partitions with dry-wall interfaces to form a contemporary offices configuration spread over three floors.

Full height glass and timber doors created a modern working environment that was complimented by curved and raking bespoke feature walls.

Stortford Interiors worked in close conjunction with the specified product manufacturers to ensure lead times were minimised and critical dates met.

The quality of this prestigious installation was recognised by the ‘Association of Interior Specialists’ who awarded the works a ‘Highly Recommended’ accolade.

Cancer Research UK


Addenbrookes Hospital Cambridge

Main Contractor: Laing O'Rourke

Value: In excess of £1M

Architect: Anshen Dyer

Scope of works: Metal ceilings, drywall partitions, glazed partitions

A prestigious interiors fit-out for one of the industry’s major protagonists. The full range of Drywall products and solutions complemented by high quality metal ceilings and glazed partitions to specialist areas.

Imperial War Museum


Duxford - Airspace Exhibition building

Main Contractor: Laing O'Rourke

Value: In excess of £900K

Architect: Hok International Ltd

Scope of works: Drywall partitions and ceilings, structural partitions and ceilings (Knauf SBS)

Colin McEvoy and his team undertook the strip-out and refurbishment of the Imperial War Museum at Duxford in late 2005 and early 2006. This drywall-based project called for walls in excess of forty feet high and for structural walls and ceilings to demanding specifications. The Client's preparations for this project involved moving all his full size planes - from Spitfires to Concords - out of the area to be refurbished and then back in again. One of the East of England’s major tourist attractions is now full of Stortford Interiors' work!

London Academy


Edgware, Middlesex

Main Contractor: Wates Construction Ltd.

Value: £605K

Architect: Sir Norman Foster & Partners

Scope of works: Metal and plasterboard ceilings, drywall partitions, glazed partitions, joinery

A five-month fit-out at one of the new wave of flagship Academies. Full height glazed partitions grace a four-storey high atrium running the entire length of the building. Further glazed partitions and doorsets create a network of classrooms, quiet study areas and staff rooms. Stortford Interiors also undertook all the M/F and metal ceilings and fit-out elements to the Gym, changing rooms and WC blocks. This project was notable for the majority of the installation being undertaken by Stortford Interiors' directly employed fixing crews.

Tiffany & Co.


Sloane Square, London

Main Contractor:
StructureTone UK Ltd

Value: £400K

Architect: Househam Henderson

Scope of works: Drywall partitions and ceilings, structural partitions and ceilings (Knauf SBS)

Over three phases, Stortford undertook the Drywall and Ceilings – M/F, fibrous plaster, mineral fibre – to Tiffany’s flagship store interlinking London’s Old Bond Street and Albermarle Street. And all to Tiffany’s unique and exacting standards (replicated in stores throughout the world). Premium West End retail space such as this meant that all deadlines were non-negotiable and activities continued around the clock when necessary.

Royal College of Anaesthetists


Red Lion Square, Holborn, London

Main Contractor:
StructureTone UK Ltd

Value: £485K

Architect: Tilney Shane

Scope of works: Metal and plasterboard ceilings, drywall partitions, glazed partitions, joinery

A fascinating project with a variety of demands brought about by the building’s distinctive shape and the age of some of its parts. Some areas required minimal attention; others needed refurbishing to a functional standard, whereas high profile areas such as the Auditorium and the Board Room (both photographed here) were built from scratch to state-of-the-art specifications.

“Once again, another successfully completed job delivered by Stortford Interiors, on a project that was commercially very tight, with a drop-dead programme date and a client who sought only the highest standards of quality”
Mark Ballantine Operations Director Refurbishment Division, StructureTone UK

The Stanway School


Colchester

Main Contractor:
Amec Group Ltd

Value: £600K

Architect: Stanley Bragg Ltd

Scope of works: Mineral Fibre Suspended Ceilings / MF ceilings / Dry-lining / Beam Encasements and Plastering Packages

Stortford Interiors utilised their multi-disciplined experience to deliver this expansive educational installation. Stortford Interiors satisfied this stringently programmed project to ensure handover dates were met to enable the school to become ‘live’ at the beginning of the new term.

The works evolved primarily around classroom and music room fit-outs where product durability and acoustic performances were of great importance.

This project was yet another successful public sector installation for Stortford Interiors.

Raytheon Systems Ltd Harlow, Essex

Main Contractor: Stortford Interiors


Stortford Interiors has worked with Raytheon Systems as their principle contactor for many years providing a wide range of refurbishment services. Examples include the refurbishment of their five factory units in Harlow, and the recent relocation of their missile testing facility from Bedford to Harlow.

The scope of works for Raytheon Systems on an on-going basis includes partitions, ceilings, flooring, electrical work, plumbing, sanitary, decoration and M&E.

Raytheon Systems require their strategic partners to attain SixSigma. As a preferred supplier, Stortford Interiors have complied with and undergone training and passed SixSigma certification. SixSigma is Raytheon's knowledge based process for transforming culture to maximise customer value and grow business. This certification is recognised by other major companies such as Tyco and MK Electric.

E2V

Main Contractor: Stortford Interiors


Stortford Interiors provide E2V, formerly Marconi, with a responsive service to carry out partitioning and ceiling work in line with their ever evolving production requirements. We are working with industrial type steel partition systems, suspended ceilings, carpets and vinyl flooring.

“Stortford Interiors are a well resourced organisation who are able to respond promptly and efficiently to any request, no job is too big or too small. Their personnel are experienced customer focused tradesmen who work safely to deliver a high quality installation.”

Martin Griffin E2V

 

BAE Systems Chelmsford

Main Contractor: Stortford Interiors


The scope of works provided by Stortford Interiors for BAE Systems includes regular dismantling and installation of partitioning. We have recently refurbished toilet and shower areas, and are currently refurbishing their ground floor area, which involves the movement of over 200m of partitioning.

“We (under many names… Marconi Radar, GEC Marconi, BAE Systems, etc.) have for the past 12 years used Stortford Interiors exclusively , from initial fit-out to the hundreds of internal alterations on many of our sites including Eastwood House. We have been more than happy with Stortfords, from their professional outlook on tasks, competitive pricing, helpfulness and flexibility in this constantly changing environment. Their staff have always been respectful, and cheerful even under sometimes arduous conditions. We look forward to continuing our long standing working relationship with them.”

Allen White BAE Systems

 

The Department for International Development (DFID)

Main Contractor: Stortford Interiors


Due to the sensitive and prestigious environment of the DFID, the scope of works carried out by Stortford Interiors are mostly undertaken outside normal office hours, and involve on-going partition refurbishment.

“We have a significant requirement for interior layout changes. Stortford Interiors have been our main contactor for several years, and we have always found them to be very responsive - combining comprehensive survey and planning services with high quality workmanship. Any follow-up issues have always been dealt with promptly and efficiently.”

Niall Coffey DFID

 

CONEL

Main Contractor: Stortford Interiors


In recent years we have carried out major refurbishments acting as CONEL's principle contractor. Refurbishment areas have included small work units for training purposes, gym with changing room facilities, disabled changing rooms complying with DDA regulations and relocation of classroom walls. The scope of works has included partitioning, ceilings, carpeting, M&E, plumbing and decorating.

We are currently refurbishing a Crèche area over the summer period, together with a range of partitioning and ceiling work throughout the college.

“Stortford Interiors have always produced quality work, on programme, within costs and to specification. From tender to completion, the management and their team keep us up to date with developments, and they are a 'can do' organisation”

Denis Lawton Head of Estates, College of North East London

 
   